Complex assets.
Clear perspective.
From the first study to the final sequence. Principal-led engineering that connects the technical basis to what happens in the field.
Illustrative sequence · conceptual only · not an approved procedure or engineering assessment
As-found. The asset as inherited. Boundary, interfaces and condition set the starting basis.
Reduced motion: choose a stage to step through.
Years of engineering
experience
Australian and
international markets
Asset classes
The right questions.
A stronger basis.
Decommissioning decisions are only as strong as the thinking behind them. Start with the question your project needs answered.
What exactly is being decided?
Define the asset boundary, screen the options and establish the technical basis for the next project decision.
A study report or technical memorandum, built around the decision it must support.
Build a scope around this
Good engineering
holds up out here.
Complexity, worked through.
One decision at a time.
Four moves. A visible record at every step. The result is a conclusion another engineer can follow, challenge and use.
Frame the decision.
Confirm the asset, battery limits, interfaces and required decision. Agree what the work will deliver and what sits outside it.
Boundary inferred
Boundary explicit
Battery limits, interfaces and exclusions are stated.Grounded in delivery.
Across assets. Across borders.
Selected work from Shaun's career in senior project engineering roles, before SPE Group was established.
These are personal career credentials, not SPE Group company commissions.
Detailed scope descriptions can be discussed where confidentiality permits.
One accountable engineer.
The right people around the work.
SPE Group is a specialist project engineering consultancy, led directly by Shaun Kurien. More than eleven years across offshore work, decommissioning, demolition and heavy lift inform every engagement.
Structural, marine, environmental and other specialists join where the agreed scope requires them. Technical detail and commercial consequence stay connected.
Where a scope requires execution capability, SPE works alongside Endura Decommissioning (opens in a new tab).
SPE Group Pty Ltd and Endura Decommissioning remain separate legal entities.Your project.
A practical starting point.
Tell us where the project stands. Turn three choices into a first brief for discussion.
A scoping aid, not engineering advice or a quotation. Final scope depends on the asset, information and required decision.
Start with a controlled study basis
Confirm conflicts and assumptions before detailed development. Frame the study around the decision the work must support.
- KEY QUESTION
- What decision must the study support, and which boundary must be stable first?
- FIRST DELIVERABLE
- Study report with assumptions, option basis and data-gap register
- START WITH
- Asset summary, available drawings, prior studies and the decision required
- LIKELY ENGAGEMENT
- Defined work package, typically fixed fee when the source set is stable
Before we begin.
A short asset summary and the decision required are enough to start a conversation.
Bring the asset.
Let’s work through
the decision.
Send a brief outline of the asset and the decision required. Shaun will reply directly with the information needed and a proposed next step.
shaun@spegroup.com.au +61 450 165 492Available for Australian
and international scopes.
ABN 75 697 068 321
ACN 697 068 321